面向美国建筑计量数据 AI 需求预测的验证式数据接入流程:设计、受控评估与一项修正后的阴性结果
摘要
这篇 arXiv 论文提出了一套面向美国建筑计量数据 AI 需求预测的验证式数据接入流程,报告了一项受控评估结果,并给出了一项关于该流程有效性的修正后阴性结果。
arXiv:2610.02397v1 Announce Type: new
Abstract: Electric utilities and grid operators increasingly rely on machine-learning models to forecast next-day demand, and those models learn from meter data that is routinely defective: readings go missing, sensors freeze, buildings read zero for hours, and units change by a factor of 100. This report presents a data-onboarding pipeline that detects and repairs such defects before a model is trained, using only information available at forecast time, and a controlled experiment that measures whether the pipeline protects a 24-hour-ahead forecast. On hourly electricity data for twelve U.S. buildings from the public Building Data Genome 2 dataset (210,528 rows, 2016-2017), seeded, hash-logged defects touching 0.10% of the training period raised the error of a gradient-boosting forecaster by 86%; after detection and past-only repair the error returned to the clean-data level (mean absolute scaled error 0.760 clean, 1.415 corrupted, 0.729 repaired) while 93% of training targets were retained. At a defect prevalence calibrated to published field studies (1.6% of training rows) the unprotected forecaster's error reached 4.4 times that of a seasonal-naive rule, and the repaired forecaster again matched the clean baseline. The same pattern held for ridge regression and a random forest and across horizons of 1 to 24 hours. A first version of the pipeline over-cleaned natural data and made forecasts 25% worse; that result is retained, its cause is traced in the published artifacts, and the per-building calibration that corrects it is documented as a dated amendment. Every number is reproducible from pinned public inputs with SHA-256 verification, 84 automated tests and continuous integration.
查看缓存全文
缓存时间: 2026/10/05 10:04
# Validated Data Onboarding for AI Demand Forecasting on U.S. Building Meter Data: Design, Controlled Evaluation, and a Corrected Negative Result Source: [https://arxiv.org/abs/2610.02397](https://arxiv.org/abs/2610.02397) Bibliographic Tools ## Bibliographic and Citation Tools Bibliographic Explorer Toggle Code, Data, Media ## Code, Data and Media Associated with this Article Demos ## Demos Related Papers ## Recommenders and Search Tools IArxiv recommender toggle About arXivLabs ## arXivLabs: experimental projects with community collaborators arXivLabs is a framework that allows collaborators to develop and share new arXiv features directly on our website\. Both individuals and organizations that work with arXivLabs have embraced and accepted our values of openness, community, excellence, and user data privacy\. arXiv is committed to these values and only works with partners that adhere to them\. Have an idea for a project that will add value for arXiv's community?[**Learn more about arXivLabs**](https://info.arxiv.org/labs/index.html)\.
相似文章
智能电表能源预测的深度时间序列模型实证基准测试
本文对九种深度学习模型在智能电表数据上的能源预测进行了基准测试,揭示了随着历史输入的增加,准确率会饱和;随着预测时间范围的延长,准确率下降;轻量级模型提供了成本效益高的替代方案。
从智能电表数据揭示住宅PV-EV共同采用:负载原型与检测用于需求侧规划
本文提出一个集成工作流,利用智能电表数据聚类负载曲线,并使用机器学习模型检测PV/EV共同采用,以辅助需求侧规划和网络管理。
满足EU-AI法案要求的安全关键环境中的短期负荷预测:德国输电网总负荷41天实时挑战赛结果
本文介绍了为期41天的实时挑战赛的结果,该挑战赛评估了针对德国输电网总负荷的短期负荷预测流程,该流程旨在满足安全关键环境中的EU-AI法案要求。开源的spotforecast2-safe流程优于ENTSO-E基线,并与大型基础模型保持竞争力。
分解式AI评估中的预测驱动平滑与验证
该论文提出了用于分解式AI评估的预测驱动平滑和验证方法,提高了在标记数据有限的领域中点估计和区间估计的准确性。
AI 驱动的热感知数据中心容量规划
一篇 arXiv 论文提出了一种 AI 驱动的热感知数据中心容量规划框架,可在毫秒级时间内预测温度,在未见过的设计上实现高精度,相比高保真 CFD 仿真加速达 10,000 倍,从而实现面向 LLM 数据中心的工作负载分配与 HVAC 制冷的实时优化。