Tag
The article argues that power interconnection, not chip supply, is becoming the main bottleneck for AI infrastructure buildout, with a projected $4.1 trillion in spending by 2028 that assumes adequate power availability.
The article analyzes US grid capacity constraints and models the shortfall that must be filled by behind-the-meter power solutions for datacenters, projecting over 40GW by 2028.